23101-1-Elektrotechnik-Kurs

To start with this project was complicated. The reviewer did not realize the requirement for side plating as a mechanical protection for the different parts of the panel (different from high speed signal protection). There were discussions about the breakouts. So the whole process became delayed for 5 days! The supervisor was then changed, the project proceeded. The quality of the finished product is great and the shipment was very fast. The manufacturing was in shorter time. So the whole time from command to receipt was 10 days. With respect to the starting delay, this is fast! Remark: The rating is for the second supervisor and not for Celia Deng. She would only have 2...3 stars in every category!


Nov 16,2023
53 viewsReport item
  • Comments(0)
  • Likes(0)
You can only upload 1 files in total. Each file cannot exceed 2MB. Supports JPG, JPEG, GIF, PNG, BMP
0 / 10000

    You might like